Key points
- Studies of US and German firms found downsizing did not lift later performance on average; in Germany, cuts made for efficiency appeared least successful.
- Where the work stays, its cost tends to reappear in contractors and temporary staff, and in sick leave, disability and resignations among those who remain.
- Map demand, rework and handoffs before you redraw the structure, remove the avoidable work, then size teams and count every form of labour.
When a cost target arrives, your organisation chart is the obvious place to look. Roles can be counted, priced and removed, and the saving shows in the next pay run.
The saving does not always hold. Between 2009–10 and 2011–12, the main UK government departments cut their spending on consultants and temporary staff by about three-quarters1. From then on, as they reduced their permanent workforce, that annual spending climbed back by £400 million to £600 million1. To the National Audit Office (NAO), the pattern looked like a stopgap rather than a strategy1.
A role is where work gets done. Remove the role but not the work, and someone still does it. It may be a contractor, a colleague who stays, or the replacement for one who leaves. The cost moves rather than goes. It leaves for good only when the work does.
Cutting roles has not lifted performance on average
The research on downsizing gives the arithmetic little support. One study of US manufacturing firms allowed for how each firm had performed before it cut2. Downsizing was associated with lower profitability afterwards2. The effect was stronger in industries that are research-intensive, fast-growing or less reliant on plant and equipment2.
A study of large German firms looked at the short-term effects of downsizing3. Performance fell while the cuts were under way, and productivity and profitability afterwards were at best back where they started3. Firms that cut to raise efficiency, rather than in response to a downturn, appear to have fared worst3.
These are averages, and results vary by industry and motive2,3. The evidence that follows suggests one reason the average is poor: the people go, but the work they did stays.
The work moves to another payroll
Work that stays must still be done, and one answer is to buy it in. Buying in can cost more. The NAO found specialist temporary staff were generally paid twice as much as comparable in-house staff1. Temporary administrative staff, by contrast, cost about the same per day1. The NAO also found strategic workforce planning under-developed across departments1.
Staff numbers do not show this shift. When the Australian Government first counted its whole workforce, for 2021–22, 112 entities reported 144,271 public servants4. They also used external labour equal to 53,911 full-time workers: contractors, consultants, labour hire and outsourced service providers4. That external labour cost $20.8 billion, about one dollar in every four of departmental spending4. Public servant numbers count only people on an entity's own payroll4. The full workforce was about 37% larger than they showed4.
Moving work the other way moves its cost too. From 2024–25, agencies were asked to bring core work back in-house5. Their combined target was to cut supplier spending on core work by $527.6 million that year5. The Australian Public Service Commission (APSC) noted that this was not a saving, because employee costs would follow the work6. Whichever payroll the work sits on, its cost goes with it.
The people who stay carry the rest
Work that is not bought in stays with the people who remain. A long-running study of municipal employees in four Finnish towns shows what that can cost. Among 22,430 employees who kept their jobs, sickness absence rose after major downsizing7. That meant a cut of more than 18% of staff in their occupation and workplace7. The rise was seen in permanent employees, not temporary ones7.
Disability retirement rose with the size of the cut. From 1994 to 1998, the rate was 7.7 per 1,000 employees where staff fell by under 8%8. After major downsizing, it was 14.9 per 1,0008. Adjusted for age, sex, occupation and other factors, the risk after major downsizing was 1.81 times that after none8. The authors argue that quick savings should be judged net of later disability costs to employers and society8.
A smaller study in one Finnish town points to a mechanism. Among 764 employees who stayed, sickness absence was more than twice as high after major downsizing as after minor9. Changes in the work itself accounted for about half of that link9. They included heavier physical demands, less control over the job and more insecurity9.
Some of those who stay then leave. Across organisations in several industries, downsizing predicted higher voluntary turnover, and lower commitment helped explain the link10. Practices that bind people to the organisation, or show that decisions are made fairly, weakened the effect10. These costs land in sick leave, disability, recruitment and backfill, away from the line where the saving was counted.
Remove the work, then size the team
A lasting reduction starts with the work, not the chart. Before you redraw the structure, we would map demand, rework and handoffs in each area.
Demand is what arrives, from whom and why. Some of it exists only because something earlier went wrong. A customer chases a late answer, or a form comes back incomplete. Rework is work done again because it was wrong or incomplete the first time. Handoffs are the points where work passes between people or teams. Each one adds a wait, a check and a chance of error.
The map shows which work can go. Fix the causes of repeat demand and rework where they start. Join steps that are split across teams, and stop reports and approvals that no decision uses. Then size each team to the work that remains, including its peaks, leave and training. The structure follows, and roles that held only removed work close with it.
This takes longer than a headcount target. But the saving leaves with the work, not ahead of it.
Give one owner every labour decision
A lower cost base holds only if the work cannot return by another route. Count every form of labour you use in one view: employees, overtime, contractors, labour hire, consultants and outsourced services. A headcount or staffing cap sees only the first of these.
A control on one category can be met while the total grows. In September 2026, the Australian National Audit Office (ANAO) reported on the framework for bringing core work in-house5. It found the design let agencies meet their targets even if their total spending on external workers rose5. In its sample of 22 entities, 12 reported reductions under the framework totalling $90.3 million in 2024–255. In the same year, those 12 increased their spending on external labour by $375.4 million5.
We would give one executive in each area every decision to add labour, on any payroll. That covers a new role, a backfill, a contractor and an outsourced service. Measure the area's total labour cost against the work it handles, not its headcount. Watch sick leave, resignations and backfills in the year after any change, alongside the saving.
| 2021–22 | Number | Share |
|---|---|---|
| Public servants (average staffing level) | 144,271 | 73% |
| External labour, including outsourced providers (full-time equivalent) | 53,911 | 27% |
| Whole workforce | 198,182 | 100% |
Source: Department of Finance, The Australian Government's report on the Audit of Employment, 2021–224. Sample: 112 entities employing staff under the Public Service Act 1999, self-reported.
| Main central government departments | Spending on consultants and temporary staff |
|---|---|
| 2009–10 | About £2.7 billion |
| 2011–12 | About £0.7 billion |
| 2014–15 | £1.0 billion to £1.3 billion |
Source: National Audit Office (UK), Use of consultants and temporary staff, 2009–10 to 2014–151. Sample: the 17 main central government departments.
| Downsizing in the employee's occupation and workplace | Disability pensions per 1,000 employees |
|---|---|
| None (staff cut by less than 8%) | 7.7 |
| Minor (8% to 18%) | 13.1 |
| Major (more than 18%) | 14.9 |
Source: Journal of Epidemiology & Community Health, Organisational downsizing as a predictor of disability pension, 1994 to 19988. Sample: 19,273 municipal employees aged 21 to 54 in four Finnish towns.
Where to start
- Map the work in each area before you touch the structure. Record what arrives and from where, how often it is redone, and how many hands it passes through.
- Separate avoidable work from necessary work. Remove the causes of repeat requests and rework, and retire reports and approvals that inform no decision.
- Size each team to the work that remains, including peaks, leave and training. Then design roles and reporting lines around that work.
- Count every form of labour in one view, from employees and overtime to contractors, labour hire, consultants and outsourced services. Report its cost against the volume of work, not headcount.
- Give one executive in each area every decision to add labour, on any payroll. Track sick leave, resignations and backfills for a year after each change.